Projects

From large facilities and public infrastructure to commercial fit-outs and residential work, here are some examples of what we do. Every project, no matter the size, is delivered with the same reliability, expertise and care.

CPO External Lighting Upgrade

  • Client: Auckland Transport
  • Partners: Legacy Construction
  • Division: Electrical
  • Completion: 2022
  • Core team: 7+
  • Services provided: Lighting retrofits, compliance upgrades, 24/7 emergency on-call.


Full replacement of external feature lighting for the restored historic CPO landmark. Delivered to architectural lighting design requirements, within heritage restrictions, using innovative solutions such as 3D-printed brackets.

Northern Arena Facility Maintenance

  • Client: Northern Arena
  • Division: Mechanical,
  • Electrical, Plumbing
  • Completion: Ongoing (since 2020)
  • Core team: 5+
  • Services provided: Preventative maintenance, emergency works, compliance support, 24/7 emergency on-call.


Full responsive and preventative maintenance for a major leisure facility including pools, gym, studios and support areas. Specialised procedures minimise disruption to operations while meeting compliance and BWoF requirements.

BFT Gym Renovation

  • Client: Body Fit Training Whangaparaoa
  • Partners: Albertyn Group
  • Division: Electrical
  • Completion: 2022
  • Core team: 7+
  • Services provided: Lighting retrofits, compliance upgrades, 24/7 emergency on-call.


Full electrical refurbishment for a gym conversion from bakery to first-class training facility. Delivered efficient lighting, power and compliance upgrades.

Mt Smart Solar Installation

  • Client: Auckland Stadiums & Endless Energy
  • Completion: 2025
  • Core team: 10+
  • Services provided: Solar system installation, design coordination, complex logistics planning, stakeholder management, compliance support.


Large-scale solar project for an iconic Auckland venue, Go Media (Mt Smart) Stadium. 1,700 panels across the East and West Stands deliver a 750kW system generating around 800MWh annually — meeting 60% of the stadium’s electricity needs. Installation included helicopter panel delivery to meet tight timeframes.

CDC BMS installation

  • Client: CDC Silverdale & Hobsonville
  • Division: Mechanical, Electrical, Plumbing
  • Completion: 2025
  • Core team: 12+
  • Services provided: Cabling & infrastructure, custom DB board design and build, HVAC and sensor integration, busbar installation, generator & UPS integration, chiller connection and monitoring, BMS commissioning.


Full Building Management System (BMS) installation across two major Auckland facilities, creating a centralised platform to control HVAC, power, and plant systems. Delivered efficiency, resilience, and scalability through integrated cabling, sensors, backup systems, and in-house designed DB boards.

AOR Facility Maintenance

  • Client: Auckland One Rail (AOR)
  • Division: Mechanical, Electrical, Plumbing
  • Completion: Ongoing
  • Core team: 10+
  • Services provided: HVAC servicing and seasonal efficiency tuning, plumbing maintenance for water supply, drainage and washrooms, scheduled inspections and testing of DB boards and lighting, emergency and UPS maintenance, compliance support, 24/7 call-out, asset management and reporting via Simpro.

 

Ongoing HVAC and plumbing maintenance across Auckland’s rail network. Work focuses on public safety, passenger comfort and compliance, ensuring stations remain reliable, efficient and fit for purpose every day.

AT Facility Maintenance

  • Client: Auckland Transport
  • Division: Mechanical, Electrical, Plumbing
  • Completion: Ongoing
  • Core team: 15+
  • Services provided: Scheduled inspections and testing, LED upgrades, generator and UPS maintenance, hot water and backflow checks, leak and blockage response, HVAC servicing and seasonal tuning, compliance support, 24/7 call-out, asset management and reporting via Simpro.


Comprehensive maintenance contract covering electrical, plumbing and HVAC systems across Auckland Transport facilities. Services ensure public safety, operational compliance and asset reliability while supporting AT’s long-term sustainability goals.

Residential Solar Install

  • Client: Private Residential, Hamilton
  • Division: Electrical
  • Completion: 2025
  • Core team: 3+
  • Services provided: Solar panel installation, PV cabling and switchboard integration, inverter installation and commissioning, compliance testing and certification, long-term maintenance support.


Full solar installation for a Hamilton home, delivering sustainable, cost-efficient energy. The system includes a roof-mounted solar array, inverter setup, and integration into the property’s switchboard for seamless household power management.

Woolworths Decommissioning

  • Client: Woolworths New Zealand
  • Division: Electrical
  • Completion: 2024
  • Core team: 3+
  • Services provided: Electrical disconnection and compliance, signage decommissioning and removal, site safety management, coordination with signage installers.


Decommissioning and removal of external illuminated signage at a local supermarket, following the rebrand from Countdown to Woolworths. Work included safe electrical disconnection and dismantling of building-mounted signage to prepare for new branding installation.